B819 - CLV 01
Resume
Scope of work: Positioning and foundation modelling for the equipment in Engine Room. Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room. Tank and Pipe Arrangement. Layout drawings. Foundation drawings.

Back