N817 - PSV 07 CD
Resume
Scope of work: Positioning and foundation modelling for the equipment in Engine Room, Casing and Bow Thruster Room . Pipe Line arrangements, routing and isometric drawing issues for all the systems in Engine Room, Casing and Bow Thruster Room. Tank and Pipe Arrangement. Layout drawings. Foundation drawings.

Project description
N817 - PSV 07 CD
 
Client: STX Piping AS/Aukra, Norway
Started at: 2013
Completed at: 2013
Status: Completed